# 3-Year Business Plan — Draft

Nov 21, 2026 · @Akinobu Fukuzaki

[PDN-Planning Draft] **Draft for the owner's review, as of 21 November 2026.** Assumed audience: the owner and anyone he chooses to share it with (an advisor, a lender, a key employee). It builds on the diagnosis summary of the same date and adds no figures beyond the owner's own.

## Summary

- **Purpose:** recover installation work, turn the 1,080-home agreement base into a growing source of replacements, and steady cash through the slow months, over 2027–2029.
- **Main figures (owner's):** revenue about $1.28M last year; installations about $400k, down from about $560k three years ago; about 1,080 agreements at about $275 a year.
- **Key decision:** add capacity by hiring a fourth technician, or by subcontracting installation work. The plan recommends deciding **after** the first checks show which constraint is actually binding, and before the June–August 2027 peak.
- **Biggest uncertainty:** whether lost installations are mainly lost members or lost new leads, and whether they are lost on price or on quoting speed. Most of the plan's direction turns on that.

**Legend:** *Fact* = the owner's figure or statement. *Assumption* = a working belief to verify, listed in the register. *Unknown* = not yet known; shown as **[To confirm: …]**. *Proposed* = a suggestion in this draft, not a decision.

## Starting point

A 14-year-old residential HVAC company in suburban Houston that is busy but has been losing its highest-value work.

| Item | Today (fact) | Status |
| --- | --- | --- |
| Revenue, last year | about $1.28M: repairs \~$584k, installations \~$400k, agreements \~$296k | Fact |
| Installations, three years ago | about $560k | Fact |
| Agreements | about 1,080 active at \~$275/year; \~3% cancel a year; count flat | Fact |
| People | Owner (58, \~55 h/week, all estimates plus some field work); 3 technicians at $32–38/h plus summer overtime; office person 20 h/week | Fact |
| Fixed costs | Rent $4,200/month; 4 trucks | Fact |
| Seasons | Peaks Jun–Aug and Dec–Jan; slow Mar–Apr and Oct | Fact |
| Competition | Losing more bids to national chains advertising low prices | Fact |
| Costs | Refrigerant, parts and labor rising | Fact |
| Profit by job type, revenue per technician, cash by month | **[To confirm: from bookkeeping and billing records]** | Unknown |

**Causal picture carried from the diagnosis (still hypotheses):** the agreement base keeps crews busy with tune-ups and repairs but may not be producing replacement jobs. Some quotes may be lost on speed because every estimate runs through the owner. Prices may have fallen behind costs, and fixed costs run through three slow periods.

## Objectives

Each objective is tied to the problem it addresses and the reason it should help. Targets are left open until the Year 1 checks set a baseline.

| # | Objective | Problem it addresses | Why it should work (hypothesis) |
| --- | --- | --- | --- |
| O1 | Win back installation work, starting with agreement members | Installations down \~29% in three years | Members already trust the company; reaching them before a chain does should lift capture |
| O2 | Grow the agreement base, not just hold it | Count flat; \~30 sign-ups a year (calculated) | A consistent offer on every repair visit should raise sign-ups while cancellations stay low |
| O3 | Make prices cover today's costs | Possible price lag behind rising costs | Regular, recorded price reviews stop the margin eroding a little each year |
| O4 | Even out cash across the year | Fixed costs run through three slow periods | Agreement billing and visit scheduling can move money and work into the slow months |
| O5 | Reduce dependence on the owner for estimates | All quotes run through one person at \~55 h/week | A second person able to quote should cut response time and lower key-person risk |

## Roadmap

Year 1 measures and fixes, Year 2 builds, Year 3 makes it last. Each year opens only when the gate before it is passed.

### Year 1 (2027): measure, then fix the cheapest levers

| Milestone | Done when | Objective | Proposed timing |
| --- | --- | --- | --- |
| Estimate look-back complete | Last 12 months of quotes marked member/new lead, won/lost, days to quote | O1, O5 | Before the March–April slow period |
| Price check complete | 2–3 common repairs and an agreement renewal compared then vs. now, against supplier costs | O3 | Before the March–April slow period |
| Billing timing known | Agreement payment method and renewals by month listed with the office person | O4 | Before the March–April slow period |
| Agreement offer made standard | A written offer every technician uses on repair visits; offers and sign-ups counted | O2 | Spring 2027 |
| Capacity decision made | Gate A passed (below) and one option chosen | O1, O5 | Before June 2027 |
| Price review done | New repair and agreement prices set, or a documented decision to hold | O3 | **[To confirm: owner to set date after the price check]** |

**Gate A (into the capacity decision):** the three checks are complete. Then choose: if lost quotes cluster on speed or members, fix quoting first; if field hours in peak are the limit, add capacity (see the decision section).

### Year 2 (2028): build the replacement pipeline

| Milestone | Done when | Objective |
| --- | --- | --- |
| Member replacement program running | Ageing member systems are flagged at tune-ups and quoted before failure | O1 |
| Second person able to quote | Someone other than the owner sends standard replacement quotes | O5 |
| Capacity option reviewed after one full peak | Year 1 results compared against the continue/adjust/stop criteria | O1 |
| Slow-month plan in place | Agreement visits and billing scheduled to fill March–April and October | O4 |

**Gate B (into Year 3):** member capture, quote speed and sign-ups have moved in the right direction against the Year 1 baselines. If not, revisit the causes before scaling.

### Year 3 (2029): make it last

| Milestone | Done when | Objective |
| --- | --- | --- |
| Owner's role narrowed | Owner works mainly on estimating oversight and the business, not daily field work | O5 |
| Annual price review routine | Prices reviewed and recorded once a year | O3 |
| Succession options outlined | The owner has written down his intentions for the business's future | O5 |

## Pending decision: fourth technician or subcontracted installations

**Proposed:** decide after Gate A, before June 2027. First establish which constraint is binding: field hours in peak, the owner's quoting time, or bids lost on price. Neither option helps if the real cause is lost bids. Subcontracting installations adds installation capacity, but installations are falling because bids are lost, not, as far as we know, because crews can't fit them in.

|  | Option A: hire a fourth technician | Option B: subcontract installation work |
| --- | --- | --- |
| **Pros** | Adds field hours in both peaks. Can take field work off the owner, freeing time to quote faster. Company controls quality and the customer relationship. Another person who can offer agreements on visits. | Cost moves with the work: paid only when there is an installation. No hiring needed, which avoids the local shortage of experienced technicians. Frees own technicians for repairs and agreement visits. Quick to start or stop. |
| **Cons** | Experienced technicians are hard to hire locally. Wages run year-round, including the three slow periods. Training and supervision would likely fall on the owner. | Less profit per installation, since the subcontractor takes a share **[To confirm: subcontractor quotes]**. Less control over quality, warranty work and the customer's experience. Subcontractors are likely busiest in the same peaks. Doesn't reduce the owner's estimating load. |
| **Main risks** | A long or failed search. A hire who doesn't meet the standard. Paying for idle hours in March–April and October, which adds to the cash strain. | Poor workmanship or callbacks under the company's name. Members switching to the subcontractor or a chain. No crew available in a heat wave. |
| **What must be true** | Someone suitable can be hired **[To confirm: owner's sense of the local hiring market and time to fill]**. There is enough paid work to keep them busy outside the peaks, for example agreement visits moved into slow months. Prices cover the added wage (price check). Peak field hours, not quoting, are the bottleneck. | A reliable, licensed subcontractor is available in the peaks. The remaining margin is acceptable **[To confirm: subcontractor rates]**. The company keeps the quote, the customer and the warranty. Installation volume recovers enough to need extra crews. |
| **Continue / adjust / stop** | Review after the first full peak: continue if peak backlog falls and the owner's quote turnaround improves. Adjust (move visits into slow months) if slow-month hours sit idle. Stop or don't backfill if the hire's work doesn't cover its cost. | Pilot on a few jobs first. Continue if callbacks and customer complaints stay at the company's normal level and margin is acceptable. Stop if quality slips or members go elsewhere. |

**Variants worth weighing:** hiring a less-experienced technician and training them, if the owner or a senior technician has the time. Subcontracting only peak-season overflow, not all installations. Moving some estimating to a second person (O5), which tackles quoting speed whichever option is chosen.

## Measures to track

Leading measures move first and show whether the plan is working. Lagging measures confirm the result later. All targets are **proposed** and should be set once a baseline exists.

### Leading

| Measure | How it's calculated | Source | How often | Owner | Baseline | Target |
| --- | --- | --- | --- | --- | --- | --- |
| Quote turnaround | Days from first call to quote sent | Estimate records | Monthly | Owner | Unknown (check 1) | Proposed: set after check 1 |
| Quote win rate, members vs new leads | Quotes won ÷ quotes sent, split by customer type | Estimate records | Monthly | Owner | Unknown (check 1) | Proposed: set after check 1 |
| Agreement offer rate | Repair visits with an agreement offered ÷ all repair visits | Technician job notes | Monthly | Each technician; reviewed by owner | Never measured | Proposed: set after 3 months of counting |
| Agreement sign-ups | New agreements per month | Billing records | Monthly | Office person | About 30 a year (calculated) | Proposed: set in Year 1 |
| Members' replacements lost | New systems found at tune-ups that the company didn't install | Technician job notes | Monthly | Technicians | Never measured | Proposed: lower each year |

### Lagging

| Measure | How it's calculated | Source | How often | Owner | Baseline | Target |
| --- | --- | --- | --- | --- | --- | --- |
| Installation revenue | Total installation billing | Bookkeeping | Quarterly | Owner | About $400k last year | Proposed: set after Gate A |
| Active agreements | Count at period end | Billing records | Quarterly | Office person | About 1,080 | Proposed: growth set in Year 1 |
| Agreement cancellations | Cancelled ÷ active at start of year | Billing records | Yearly | Office person | About 3% | Proposed: hold at or below today |
| Revenue per technician | Revenue ÷ field technicians | Bookkeeping | Quarterly | Owner | Never measured | Proposed: set in Year 1 |
| Cash at the end of each slow period | Bank balance end of April and October | Bank statements | Twice a year | Owner | **[To confirm: last two years' balances]** | Proposed: set with an accountant |

## Assumptions to check

| # | Assumption | Basis | How much the plan depends on it | How it's verified | By when |
| --- | --- | --- | --- | --- | --- |
| A1 | A meaningful share of lost installation quotes are agreement members | Diagnosis hypothesis; not measured | High: shapes O1 | Check 1 (estimate look-back) | Before March–April 2027 |
| A2 | Some quotes are lost on speed, not only price | Owner does all estimates while also in the field | High: shapes O5 and the capacity decision | Days to quote in check 1 | Before March–April 2027 |
| A3 | Repair rates and the $275 price have fallen behind costs | Costs rising; no record of last price change | High: shapes O3 and whether a new hire pays | Check 2 (invoices then and now) | Before March–April 2027 |
| A4 | Agreement billing timing leaves slow months short of cash | Not yet known | Medium: shapes O4 | Check 3 (billing records) | Before March–April 2027 |
| A5 | A suitable fourth technician can be found locally | Owner reports experienced technicians are hard to hire | High for Option A | Owner's hiring search or local enquiries | Before June 2027 |
| A6 | A reliable subcontractor is available in peaks at an acceptable rate | Not yet known | High for Option B | Subcontractor quotes and references | Before June 2027 |
| A7 | Technicians will offer agreements consistently once it's standard | Not yet known | Medium: shapes O2 | Offer rate after 3 months | Summer 2027 |
| A8 | Someone other than the owner can learn to write standard quotes | Not yet known | Medium: shapes O5 | Trial with one person on simple replacements | Year 2 |

## Risks

| Risk | Early-warning sign | Likely effect | Response | Owner |
| --- | --- | --- | --- | --- |
| Owner overload stalls the plan | Checks slip past the slow period; quote turnaround grows in peak | Year 1 decisions made without evidence | Do the checks in March–April; hand data gathering to the office person where possible | Owner |
| Capacity added before the cause is known | Hiring or subcontracting starts before Gate A | Higher costs with no installation recovery | Hold the decision until Gate A is passed | Owner |
| Price increase loses members | Cancellations rise above today's \~3% after a change | Smaller agreement base | Explain the change to members; review after one renewal cycle | Owner, office person |
| Hire not found, or doesn't work out | No suitable candidate by spring 2027 | Another peak without added capacity | Fall back to peak-only subcontracting or a trainee | Owner |
| Subcontractor quality slips | Callbacks or complaints on subcontracted jobs | Damage to reputation and member trust | Pilot small; keep the right to end the arrangement | Owner |
| Cash squeeze in a slow month | Bank balance falling through March–April or October | Difficulty covering payroll and rent | Use check 3 results to plan billing; discuss options with an accountant | Owner |
| Key-person risk | Owner unavailable for a period | Quoting and field work stop | Train a second person to quote (O5); write down core processes | Owner |

## First 90 days

These steps fit around the December–January heating peak and set up Gate A before spring.

- [ ] Start marking every new quote member/new lead, won/lost and days to quote (Owner)
- [ ] Ask technicians to note at each visit any member system installed by someone else (Technicians)
- [ ] Pull agreement payment method and renewals by month (Office person)
- [ ] Complete the 12-month estimate look-back (Owner)
- [ ] Compare 2–3 common repairs and an agreement renewal, then vs. now, against supplier costs (Owner)
- [ ] Write a standard agreement offer and start counting offers on repair visits (Owner, technicians)
- [ ] Get initial quotes from one or two possible subcontractors, and sound out the local hiring market, without committing (Owner)
- [ ] Review results against Gate A and choose the capacity option (Owner)

**Items needing outside review:** pricing changes, hiring costs and cash planning may benefit from an accountant's input; agreement terms and subcontract terms may need legal review. This draft prepares those discussions but does not replace them.